Showing posts with label scaffolding. Show all posts
Showing posts with label scaffolding. Show all posts
Thursday, 11 December 2014
Wednesday, 10 December 2014
Ninth Day on Site - 10/12/2014
Holding the frame
Local worker holding the frame
Local worker holding the frame
CEPT and UCJC students, Professor Parth Thaker and local worker after raising the frame
CEPT and UCJC students and local worker after raising the frame
Local workers and UCJC student on lunch time
Managing to hold the two frames
Tuesday, 9 December 2014
Eighth Day on Site - 09/12/2014
Cutting the bamboo
Assembling the frame
Assembling the scaffolding
Raising the first frame for the second time but now in the correct place
Managing to hold the first frame
Local workers relaxing at lunch time in Aspinwall
Bamboo team! UCJC and CEPT students with the local workers
Fátima Martín giving a speach about bamboo
Monday, 8 December 2014
Subscribe to:
Posts (Atom)

